Renovations of buildings were completed.
- Serkan Akgül
- Dec 25, 2024
- 1 min read
The building was repaired at the maintenance workshop located on the 48th level. Missing equipment was completed, and the maintenance of machines is carried out by our own mechanical, hydraulic, and electrical technicians in our workshop.
Comments